i
K4 OFFICES
Riyad / Saudi Arabia

Year: 2013

Year construction start: 2013

Year end work: 2013

Prevailing structure: Cemento armato

Client:  Proger spa

Status: Works realized

- See more at: http://www.giovannivaccarini.it/progetto.php?project=45#sthash.suZqPtn7.dpuf

Year: 2013

Year construction start: 2014

Year end work: 2015

Prevailing structure: Reinforced concrete

Client:  Proger spa

Status: Work in progress

This is an intervention, located in Riyadh (KSA), design of about 2000 square meters of office space on one level in a double height.

The project has as main compositional theme to configure a space the height of about 6.00 ml with light elements can ensure a great ease of access of the plant areas.

The idea of the project revolves around two key concepts:

- identity

- flexibility

The identity passes through design elements that characterize the image of Italian society who start up, elements that characterize the series of locations in the world that we have followed and drawn over the years.

Flexibility is one of the main requirements of the contemporary office space; the project interprets this theme thinking the inner shell of the building, non-standard but designed ad hoc, as an open system: ceiling discrete (non-continuous), raised ground, wainscoting "technical".